Castlemaine Perkins Beer Processing Plant

The Castlemaine project was for the new beer processing area.

The project included all the drainage for the processing equipment which had acidic and alkaline discharges ranging in temperature from 3 - 100 deg. Drainage for the processing area floors for wash down and hydrants and hose reels.

Services provided by SPP Group include:-

  • Sanitary Plumbing
  • Sanitary Drainage
  • Trade Waste Drainage
  • Cold Water Service
  • Hot Water Service
  • Warm Water Service
  • Fire Services
  • Backflow Prevention

    Castlemaine Perkins Beer Processing Plant

    Location:

    Brisbane

    Client:

    Castlemaine Perkins Pty Ltd

    Industry Sector:

    Commercial